fixed bill

英 [fɪkst bɪl] 美 [fɪkst bɪl]

定期票据,定期汇票

经济



双语例句

  1. Having fixed business place and facilities by which stamps, encryption device and bank bill vouchers may be safely protected;
    具有固定的营业地点和安全保管印章、编押机具、银行汇票凭证的设施;
  2. She fixed Bill with her withering gaze.
    她以令人畏缩的眼神凝视比尔。
  3. This paper introduces the valuation principle of the construction engineering, and analyzes on the features and differences of the valuation based on the fixed quota and the valuation based on the quantities bill.
    介绍了建设工程的计价原理,分析了定额计价和清单计价的特点与区别。
  4. Measures to prompt the transformation from fixed quota pricing to engineering bill pricing mode
    谈定额计价如何向工程量清单计价转变
  5. Besides original carries on the bank deposit and the purchase national debt, but should also include carries on investment in the fixed assets, the company share and the investment in bond, the financial bond investment, the long bill discount with accepts and so on.
    除了原有的进行银行存款和购买国债外,还应包括进行固定资产投资、公司股票与债券投资、金融债券的投资、长期票据的贴现与承兑等。
  6. As the traditional fixed network has met the needs with difficulty, people wish that they can pay fees, print bill, and query the information of vehicles anytime, anywhere.
    传统的固定网络已无法满足需求,人们希望能在任何时间、任何地点进行收费、缴费、打印票据、查询车辆信息,让公路规费征稽走出传统的征费点。
  7. Finally, in order to JinXi Petrochemical Company 1.2 million tons one year of gasoline hydrogenation installation project as an example, by using comparative analysis of two models to explain the lack of a fixed pricing model and the superiority of the implementation of bill of quantities.
    最后,本文以锦西石化分公司120万吨/年催化汽油加氢安装工程项目为实例,通过采用两种模式的对比分析,阐述定额计价模式的不足及实行工程量清单计价模式的优越性。
  8. So, our pricing model changes step by step from the fixed pricing model to the pricing mode of construction bill of quantities. Clearly, this change is a historical necessity.
    为此,我国建设工程计价模式逐步从定额计价模式向清单计价模式转变。这种转变是历史的必然。